In this intimate talk filmed at TED's offices, energy innovator Amory Lovins shows how to get the US off oil and coal by 2050, $5 trillion cheaper, with no Act of Congress, led by business for profit. The key is integrating all four energy-using sectors—and four kinds of innovation.

We need a Long Term Energy Plan and Here It Is !!!!!!!

Contributed by | Peter Lynch

The world's #1 problem is Energy 

The obvious first step in solving this critical problem is to develop a comprehensive, well thought out, technically accurate LONG TERM plan.

There is such a plan today and it is the only one that I am aware of that has been done in such a comprehensive manner as to take into account most if not all of the multiple-level consequences (i.e. unintended consequences) of each action.

Below is a video that clearly outlines the plan and lays it out for all to see. Everyone who is interested in the future of our planet and the welfare of our children and grand children needs to see this and pass it on so as many people as possible can learn of this and be aware of how we can address our #1 problem with a plan that is truly a new paradigm in energy.

The plan is: 

1. Simple

2. Straight Forward

3. Does NOT need ANY Government subsidies

4. Does not need any new legislation or Government involvement

5. Does not need any new technology break-through's

6. Can be done by business for a HUGE profit....and

7 Is a plan that would be truly bi-partisan and will benefit ALL Americans

 

 

References:

TED Video - Amory Lovins: A 40-year plan for energy  - view above or click this link.

Reinventing Fire - Rocky Mountain Institute

The content & opinions in this article are the author’s and do not necessarily represent the views of AltEnergyMag

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

​Stäubli Electrical Connectors

​Stäubli Electrical Connectors

​Stäubli Electrical Connectors are used on more than 300 GW, over 50% of the PV capacity worldwide. The MC4 family of UL and TUV listed products include connectors, in-line fuses, branch connectors, cable assembly and more.