GE Introduces Smart Grid-Compatible EV Charger
GE today introduced the GE WattStation, an easy-to use electric vehicle (EV) charger. Designed to help accelerate the adoption of plug-in electric vehicles, GE WattStation significantly decreases time needed for vehicle charging and, using smart grid technology, allows utility companies to manage the impact of electric vehicles on the local and regional grids. Steve Fludder, vice president of GE ecomagination, said, “Widespread electric vehicle adoption depends on having charging stations that integrate the need for quick charging with the personal need for easy functionality. GE WattStation will meet this challenge.” Combining functionality with consumer friendly form from renowned industrial designer Yves Behar, the GE WattStation on average decreases electric vehicle charging time from 12-18 hours to as little as four to eight hours compared to standard charging “level 1”, assuming a full-cycle charge for a 24 kWh battery. View Full News Release here
Comments (0)
This post does not have any comments. Be the first to leave a comment below.