The south side features a 53kW solar array mounted with the company’s very own PVKIT direct-attach solar mounting solution. The PV system will provide 84 MWh annually—and together with energy-saving lighting and climate controls, up to 75% of the facility’s power.

S-5! Corporate Headquarters Case Study
S-5! Corporate Headquarters Case Study

Case Study from | S-5!

The Project

Located on 4.5+ acres in the heart of Black Forest, Colorado, the two-story office building sports exterior and interior metal finishes and comfortable yet provocative space for S-5! The adjacent support building houses the company’s video training center, a prototype shop and test facilities.

The office space is a true representation of the beauty of Black Forest with design elements unique to the area and throughout Colorado, yet also expresses commercial and industrial elements representative of the industry S-5! serves—a goal for owner, Rob Haddock.

The use of native timber and natural moss rock is harmonious with the rustic mountain rural and local architecture. Corten steel (sometimes known as weathered steel) also provides a rustic appearance to the building exterior. The office features a pre-painted Galvalume® Drexel Metals 24-gauge, low-gloss black PVDF standing seam roof supported by hand-peeled log trusses and was rollformed onsite using a New Tech Machinery roof panel machine.

Just outside the city limits of Colorado Springs, this building’s interior features comfortable yet efficient workspaces and a familial environment with enough room for the business to grow. With gathering places for staff to visit and collaborate, the building clearly reflects the company’s culture, ethos, style and persona. 

 

The Challenge

Many roadblocks were encountered from conception to completion, but a clear vision, persistence and perseverance paved the way for what is now an office that many business owners could only dream of.

To begin, finding a location in Black Forest that was suitable was no easy feat. After nearly 10 years of searching, Haddock approached the veterinarian who owned the animal clinic that had burned to the ground during the Black Forest Fire of 2013. He sold the property to Haddock, and in 2018 an architect began the plans for the new corporate office.

In 2019, construction of the support building began and was completed roughly 18 months later. Then, construction on the main office building began.

Several stressful situations occurred throughout the entire process of the office build, from formal rezoning, issues with fire protection, escalated costs due to COVID, material and subcontractor availability and more, including the unexpected passing of the principal architect.

In terms of aesthetics, it was a challenge to blend rustic with modern; homelike but industrial; pragmatic but functional with old country-style appointments. This was executed as a team effort, between Haddock, his wife, Robyn, and local interior designer Candace Wilcken. 

 

The Solution

The S-5! corporate office space is the achievement of a lifelong dream for Haddock. In search of a workplace that “feels like home and a family gathering place,” Haddock wanted to blend into Black Forest in a “tasteful and non-intrusive, non-disruptive way, and wanted it to feel like it ‘belongs’ here, not stuck here.” Having spent the past 50 years as a proud resident and active member of the community, it was imperative for him that his new office be constructed in Black Forest.

The site is at 7,500 feet elevation and is known for heavy snowfall, so structure and snow retention were over-designed for 40+ psf. The office design is dual shed roofs offset by a clerestory. The support building is a gambrel roof typical of traditional barn architecture. Three different snow guard systems were utilized to showcase some of S-5!’s most popular systems.

On the south side of the office building, S-5! X-Gard 2.0 was used to accommodate the rooftop solar installation. The north office roof below the clerestory showcases S-5! DualGard. Both systems are powder coated in black to match the roof color. The adjacent support building features S-5! ColorGard, which allows for an aesthetically pleasing finish, color-matching the deep grey of the pre-painted Galvalume® roof. 

The south side of the office features a 53kW solar array mounted with the company’s very own PVKIT direct-attachTM solar mounting solution. The PV system will provide 84 MWh annually—and together with energy saving lighting and climate controls, up to 75% of the facility’s power.

 

Project Team

Architect: PWN Architects and Planners, Inc., Denver

Construction Manager: Construction Management Group of CO, Colorado Springs

Roofing Contractor: Weathercraft Company, Colorado Springs

Roof Attachments: S-5!

 

Solar Stats

Project Size: 53kW

Solar Developer: Spear Commercial & Industrial, Texas

Module Manufacturer: Trina

Inverter Manufacturer: Enphase

 

Roof Stats

Office Roof Profile: Drexel/New Tech 24-gauge, 1-1/2” x 16” double-fold, standing seam

Office Roofs Measure: 7,300 sf

Support Building Roof Profile: Rigid Global

Support Building Roofs Measure: 3,250 sf

Pitch of Roofs: 3:12

 

 

The content & opinions in this article are the author’s and do not necessarily represent the views of AltEnergyMag
S-5!

S-5!

In 1992, S-5! invented the very market space of manufactured roof attachment solutions. S-5!'s clamps and brackets are engineered for a variety of applications, including residential and commercial solar installations on exposed-fastened and standing seam metal roofing. The company has a portfolio of more than 5+ GigaWatts of rooftop solar arrays, including many Fed-Ex and Walmart buildings; 700 Costco stores in eight countries; international airports; and corporate headquarters for Google, IBM, NATO, NREL and Apple. S-5! technologies are also affordable for domestic applications with more than 15,000 such solar installations in 50 countries.

Other Articles

Demolition Ranch HQ, Boerne, Texas―Case Study
Due to the ranch’s remote location, the owner wished to build an off-the-grid building featuring a 3.84kW rooftop solar array together with a battery storage system to power the building. The rooftop solar modules are secured in place using the ProteaBracketTM by S-5!
Simplifying Solar Module Installation
The MLPE mount provides flexibility to install the MLPE device on the underside of the module frame at desired locations so wire management is simplified. The tab feature eliminates hassle
Wire Management of Rail-Less Solar PV Systems on Low-Slope Metal Roofing
Module Preparation & Strategic String Design - Part I. By strategically designing module and string layouts, prepping modules in staging areas and performing repeatable installation procedures, all hurdles to installing rail-less solar can be overcome.
More about S-5!

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

MORNINGSTAR - GenStar MPPT

MORNINGSTAR - GenStar MPPT

GenStar MPPT is the industry's first fully integrated solar DC charging system, an all-new design with "lithium DNA" from the leader in charge controllers. Out of the box, GenStar is an overachiever-delivering legendary Morningstar quality, efficiency, power and reliability along with the latest in advanced communications and control technologies. All the most installer-requested features are on-board; additional features can be easily added via Morningstar's ReadyBlock expansion technology, with snap-in blocks that provide battery metering and monitoring, signaling and load control, and lithium battery communications/control