Construction of the largest land-based wind turbine ever built in the United States.

“Reaching New Heights” uses a combination of time-lapse footage, aerial photography and behind-the-scenes action shots to document the steps involved in building MidAmerican Energy’s first concrete wind turbine tower, located at the company’s Adams wind farm in Adams County, Iowa. At 379 feet from ground to hub, the concrete turbine is more than 100 feet taller than its neighboring turbines constructed with steel towers.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Quickbase: The first application platform built for dynamic work

Quickbase: The first application platform built for dynamic work

By connecting everything through a single source of truth, the Quickbase platform helps businesses mitigate risk, reduce waste, and cut down on unexpected costs. With automated workflows and granular permissions, the right people will have access to the right information.