Amazon Invests In 150MW Indiana Wind Farm To Power Its Data Centers

From TechCrunch:  

Amazon today announced that it is working with the Pattern Energy Group to construct and operate a 150 megawatt wind farm in Benton County, Indiana.

The new wind farm will go online in about a year and the expectation is that it will supply at least 500,000 megawatt hours of wind power annually. That’s enough to power about 46,000 U.S. homes, but the “Amazon Web Services Wind Farm (Fowler Ridge)” — that’s the full name of what was previously called the “Fowler Ridge IV Wind Project” — will only be used to power Amazon’s AWS data centers. Amazon is not disclosing the financial details of this project, but Pattern Energy notes that this is a 13-year agreement.
 
As Amazon announced last November, its long-term goal is “to achieve 100 percent renewable energy usage for the global AWS infrastructure footprint.” That’s a noble goal, but given that there is no date associated with these plans, it’s a bit hard to hold Amazon accountable for it. For now, Amazon offers its users three carbon-neutral regions: US West (Oregon), EU (Frankfurt) and its AWS GovCloud.

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

MORNINGSTAR - GenStar MPPT

MORNINGSTAR - GenStar MPPT

GenStar MPPT is the industry's first fully integrated solar DC charging system, an all-new design with "lithium DNA" from the leader in charge controllers. Out of the box, GenStar is an overachiever-delivering legendary Morningstar quality, efficiency, power and reliability along with the latest in advanced communications and control technologies. All the most installer-requested features are on-board; additional features can be easily added via Morningstar's ReadyBlock expansion technology, with snap-in blocks that provide battery metering and monitoring, signaling and load control, and lithium battery communications/control