49 Megawatt Solar Farm

Ecosystem Solar Electric Corp. applying for permits to build a 49 MWe Super Peaker. The Super Peaker, a Solar Thermal Electric CSP and Recovered Free Energy Technology, Integrated Storage Component Hybrid Power Plant is to be sited near Boron, a small town located in the vastness of the Southern California Mojave Desert. It will operate 24/7/365 and is estimated to produce over 290,000 megawatt-hours, sufficient to power 45,000 homes and businesses. Construction cost is estimated at $49 million, which is lower than that of a coal-fired power plant. [read more]

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

NATURE'S GENERATOR POWERHOUSE

NATURE'S GENERATOR POWERHOUSE

Offers a maximum power output of 120V/240V 7200Watt and can power almost anything. Whether it is 120 Volts or 240 Volts, Powerhouse can single-handedly address all your home power requirements. The Nature's Generator is a solar generator built to be used anywhere, anytime. Power is supplied by our very own Power Panels and Wind Turbines, and can be connected to your home power. We ensure a clean charge without sacrificing any power, so you can stay connected wherever life takes you.