SMA was founded in 1981 by Prof. Niestetal, Germany www.sma.de/en
August 2026. GridLink AC UPS architecture decouples data center loads from the grid to resolve interconnection issues and enhance operational stability. link
August 2026. GridLink DC Power conversion system facilitates direct 800V DC power delivery from the grid to high-performance AI computing environments to maximize efficiency and scalability. link
August 2026. GridAssist Energy storage architecture provides load smoothing and power quality stabilization to ensure grid code compliance for data center applications. link