AAER Wind Energy have partnered with Fuhrländer to manufacture the Fuhrländer 1.5 MW wind turbine on a license in Canada. To identify and minimize technical risks in the process of buying 1.5 MW wind turbines manufactured by AAER, Sky Power Corp, Canada's leading independent renewable energy company awarded the contract to SGS to carry out Technical Due Diligence for the wind turbine technology.

Technical Due Diligence of the Fuhrländer 1.5 MW Wind Turbine

Charlotta Norén | SGS Group

To protect wind farm project investments and assure the quality of deliveries, owners, investors and insurance companies look for an independent certification and inspection company to verify that the wind farm or wind turbine will perform successfully throughout its intended lifetime. A minor failure can cause unacceptable down time and loss.
 
AAER Wind Energy have partnered with Fuhrländer to manufacture the Fuhrländer 1.5 MW wind turbine on a license in Canada. To identify and minimize technical risks in the process of buying 1.5 MW wind turbines manufactured by AAER, Sky Power Corp, Canada’s leading independent renewable energy company awarded the contract to SGS to carry out Technical Due Diligence for the wind turbine technology.
 
Drive Train
 
The Technical Due Diligence was coordinated and finalized by SGS Competence Center Wind Energy in Hamburg, Germany. The variety of tasks related to the Technical Due Diligence required an experienced, global team. This team of experts was mainly responsible for the feasibility and timeline of the project, review of the management and engineering capability, fatal flaw analysis and Due Diligence for all suppliers and supplier agreements.
 
The Technical Due Diligence process was carried out in three sequenced steps.
 
Phase I – Design Basis and Wind Turbine Evaluation
 
SGS’s experienced wind energy technology experts reviewed the design basis and certification status which was carried out at AMSC Windtec. All required documents were made available and the findings were reported by the SGS experts.
 
Phase II – Contract and Specifications Review
 
In Phase II, SGS examined the capabilities of AAER Wind Energy, the Canadian wind turbine manufacturer, to manufacture the wind turbines. Furthermore the contracts and warranties as well as the acceptance and reliability agreements of each supplier were evaluated. In this case special focus was put on the Fuhrländer turbine specifications and their applicability to operate in the Canadian climate.
 
Phase III – Process quality audit of suppliers
 
In the last phase, a Process Quality Audit of each supplier was performed. These audits were carried out in Germany, Poland, Austria and Canada. The main focus of the audits was the verification of the quality plan, the flow process chart, the documentation used for manufacturing and assembly and the internal work instructions and training.
 
Upon conclusion of each individual Phase, SGS reported on the outcome of the Technical Due Diligence process to Sky Power Corp. The final result was summarized in a risk assessment matrix and an action list enabling SkyPower to plan further steps in negotiation with AAER.

Case study key points
• SGS provided an experienced global team to perform the Technical Due Diligence

• The Technical Due Diligence process was carried out in three sequenced steps: Design Basis and Wind Turbine Evaluation, Contract and Specifications Review, and Manufacturing Quality and Suppliers

• The output of the Technical Due Diligence process included a risk assessment matrix and an action list for the client
 
Author: 
Charlotta Norén
Renewable Energy
Global Project Manager Wind Energy
 
The SGS Group is the global leader and innovator in inspection, verification, testing and certification services. Founded in 1878, SGS is recognized as the global benchmark in quality and integrity. With more than 55,000 employees, SGS operates a network of over 1,000 offices and laboratories around the world.

The content & opinions in this article are the author’s and do not necessarily represent the views of AltEnergyMag

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

Early Fire Detection System for Battery Storage & Charging

Early Fire Detection System for Battery Storage & Charging

Revolutionizing safety in battery reliant industries, our early fire detection system uses thermal cameras to spot early signs of battery thermal runaway. It triggers alarms and notifies users via text, voice, or email, ensuring rapid response to potential hazards. Proactive and reliable, our system sets a new standard in fire prevention for enhanced peace of mind in battery storage and charging environments.